Duke's Row
Duke's RowHarrington Square · NW1 Concept prototype

Camden · Completion 2027

Duke's Row

Eleven homes facing the gardens of Harrington Square.

Scroll to walk in

01 · The street

Pale brick,
arched stone, black iron.

Five storeys by Studio Power, behind planted railings on Harrington Square.

02 · Inside

Light oak,
open to the square.

One to three bedrooms, from 52 to 135 m², every home with a balcony or terrace.

03 · To rest

Quiet rooms,
fitted to measure.

Double bedrooms with fitted wardrobes, underfloor heating throughout.

04 · Evening

Eleven homes,
one quiet square.

Completion expected August 2027.

Harrington Square · since 1843

A Bedford Estate square,
finished in pale brick.

Duke's Row at dusk, lit windows over Harrington Square
The facade at dusk. Developers' render.

The square was laid out in the 1840s as part of the Duke of Bedford's estate, with ordered terraces around a planted garden. Duke's Row takes its name from him.

The new building sits inside the Camden Town Conservation Area. Studio Power drew it in brick and cast stone: white glazed sawtooth brick at street level, arched openings, black ironwork at the windows.

Street-level entrance number 6 with an arched stone surround and black railings
No. 6, the street entrance. Developers' render.

Choose a floor

Point at a floor.
Step inside.

Move along the facade to pick a floor, then click to fly in.

Duke's Row seen from Harrington Square Gardens
First floor

Interiors

Oak underfoot,
brass to the touch.

Open-plan living and dining set against large windows, with the gardens in view from every home.

First-floor living room with a sofa and tall windows
Living room, first floor
Kitchen in pale oak with a stone island and bar stools
Kitchen and dining, first floor
Bedroom with fitted wardrobe and en-suite
Principal bedroom
Floors
Engineered timber in living spaces, soft carpet in bedrooms
Kitchens
Quartz worktops
Bathrooms
Large-format porcelain, frameless glass showers, brushed brass fittings
Bedrooms
Doubles with fitted wardrobes
Comfort
Underfloor heating
Arrival
Terrazzo-style lobby, lift to every floor

Renders and specification as published by Salboy and Forge Homes. Furniture and art shown for illustration.

Penthouse kitchen and dining area with a banquette and a marble island

The top floor

The penthouse,
set back above the trees.

Three bedrooms on the top floor, with views over Harrington Square Gardens toward the London skyline.

75 m²
wraparound terrace
West
facing, for evening light
3
bedrooms

Neighbourhood · Zone 2

Two minutes
to the Northern line.

Mornington Crescent is around the corner, Camden High Street a short walk north, Regent's Park to the west and King's Cross to the east.

  1. 2min walkMornington Crescent Underground
  2. 10min walkCamden High Street
  3. 18min walkRegent's Park
  4. 20min walkCoal Drops Yard, King's Cross
  5. 25min walkLondon Zoo
  6. 6min by tubeEuston
  7. 14min by tubeKing's Cross St Pancras

Times as published by Salboy. Lines show direction, not walking routes. Map data © OpenStreetMap contributors.

On site

Rising now,
complete August 2027.

  1. WinterSite set up, piled foundations
  2. SpringPiling complete, tower crane up
  3. SummerSteel frame, first and second floors
  4. AutumnFrame at roof level, windows going in
  5. Aug 2027Completion
EPC
Targeting band B
Energy
Rooftop solar, air source heat pump hot water

From Forge Homes' construction updates, autumn 2026.

Forge Homes and Salboy banner on the Duke's Row site hoarding
The site hoarding. Forge Homes photograph.

The details

Eleven homes,
one quiet square.

Register interest

Opens the developers' own enquiry page.

Address
6 Harrington Square, London NW1 2JE
Homes
11: ten one, two and three-bedroom apartments and a three-bedroom penthouse
Sizes
52 to 135 m²
Outside
A private balcony or terrace for every home
Building
Five storeys, brick and cast stone, Camden Town Conservation Area
Architect
Studio Power
Developers
Salboy with Forge Homes
Completion
Expected August 2027

Sources: salboy.com development page and press release (September 2026); forgeukhomes.co.uk development page.